118km of URD Replacement in 46 Areas
•
Urban Residential Distribution in collaboration with the construction of SaskTel’s Infinet fiber network was at the program peak in 2020-21. It was the second largest Distribution Asset Management & Planning program at $18.3M. The scope was to design and install…
-
N. Battleford 20km of URD Replacement
•
Lead the design for the replacement of 20 km of Urban Residential Distribution (URD) at a cost of $2.97 million. Drilling (boring) once, under one contract to install SaskTel’s fiber network and replace SaskPower’s URD was the flagship Crown collaboration.…
-
Substation Addition to Existing Switching Station
•
Lloydminster Switching station was originally a 230kV/138kV switching station with no distribution. This project would add a 138kV/25kV transformer, and distribution bays. The SCADA design at Lloydminster is a one-of as a result of being the prototype deployment of the…
-
Transformer Top Rescue SOP Development
•
Could we rescue a person injured while working on top of a transformer? As members of the OH&S committee we were tasked with 1) Identifying viable rescue solutions 2) Proving their effectiveness for SaskPower 3) Presenting our findings at Safety…
-
Prototype Development of SaskPower Distribution SCADA
•
Traditionally SaskPower’s substations were not connected to a centralized grid control center, but that was rapidly changing with SmartGrid. The goal of the project was to develop a scalable configuration template for hundreds of substations.