Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

Helicopter Only Access Repeater Station OPGW Connection

CLIENT:

SaskPower / Cameco

LOCATION:

Key Lake, SK

ROLE:

Site Lead TeleControl

PROJECT YEAR:

2015

The scope of work included trenching ~500 meters of fiber in conduit through the Canadian Shield, connecting the OPGW dead-end structure to the communications building. Installing and commissioning a Power Line Carrier (PLC) to fiber JMUX repeater, which was used for protective tripping, remote alarming, and as part of a cellular backup for an RTU at another site. The project’s completion was jeopardized by the spring thaw and was part of a publicized deal between SaskPower, SaskTel, and Cameco.

The construction required a five-man crew and twenty-three heli-lifts, including a mini-excavator. I led all construction and commissioning efforts, including advanced logistical planning and safety considerations, which were amplified by the remote conditions and unpredictable weather.