Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

PM&P FLEXIVEYOR SHUTDOWN MAINTENANCE

CLIENT:

Potash Corp. Saskatchewan

LOCATION:

Lanigan, SK

ROLE:

Field Technologist

PROJECT YEAR:

2007

During a maintenance shutdown, field modifications were required on a Prairie Machine & Parts (PM&P) Flexiveyor that had recently entered service. Each of the 15 carts that make up the mobile 300′ conveyor belt was equipped with a WEG VFD to drive the tram. When tramming uphill or downhill, mechanical regeneration was backfeeding the VFD, causing an error. To address this, each of the 15 carts was equipped with a dynamic braking resistor, and the VFD settings were modified. All work was completed in an underground.

TAGS: