Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

Power Factor Correction Controller Retrofit

CLIENT:

Erco Worldwide

LOCATION:

Saskatoon, SK

ROLE:

Lead Field Technologist

PROJECT YEAR:

2010

The plant had a two-stage capacitor bank for power factor correction (PFC) regulated by an obsolete controller that failed. The replacement controller required modifications to integrate with the existing ladder logic. Additionally, because the replacement was not an exact match, it was necessary to devise a commissioning methodology to validate programming by testing the load versus reactance pickup curve.