Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

  • SAGD Oil Plant Bi-Annual Maintenance and Troubleshooting

    SAGD Oil Plant Bi-Annual Maintenance and Troubleshooting

    Husky Energy

    2007-2010

    As part of a contract crew, performed bi-annual electrical maintenance testing on two 25 kV oil-filled transformers, as well as 5 kV and 600 V switchgear. Additionally, in partnership with Schneider Electric, led the troubleshooting of a 5 kV reduced…

  • Power Factor Correction Controller Retrofit

    Power Factor Correction Controller Retrofit

    Erco Worldwide

    2010

    The plant had a two-stage capacitor bank for power factor correction (PFC) regulated by an obsolete controller that failed. The replacement controller required modifications to integrate with the existing ladder logic. Additionally, because the replacement was not an exact match,…

  • Electrolysis Chemical Manufacturer Substation and Rectifier Annual Maintenance

    Electrolysis Chemical Manufacturer Substation and Rectifier Annual Maintenance

    Erco Worldwide

    2009-2010

    Erco Worldwide is a chemical manufacturing plant that owns a 138 kV substation feeding multiple polyphase rectifier transformers, which connect to rectifiers on the secondary side. As part of a contract maintenance crew, responsibilities included inspecting thyristors, performing full-function testing…

  • Annual Power Plant Maintenance

    Annual Power Plant Maintenance

    SaskPower

    2007-2011

    A notable achievement in preventative maintenance occurred during an IR imaging scan when a hot spot on a 138 kV lightning arrestor was discovered. Personal expertise identified the difficult-to-detect hotspot on this single point of failure, as confirmed by experts…

  • Low Profile Canadian Compliance Review

    Low Profile Canadian Compliance Review

    Bucyrus

    2010

    Agrium acquired a low-profile Joy American coal miner and modified it for use in a Canadian potash mine. After all modifications were completed, as-built drawings were created for future operation and maintenance (O&M) needs. This included a single-line diagram, as…

  • Balzac Brownfield Substation Commissioning

    Balzac Brownfield Substation Commissioning

    AltaLink

    2010

    AltaLink was refurbishing a twin transformer substation that was approximately 50 years old. As a brownfield project in the city of Calgary, extensive planning was required to avoid both planned and accidental outages. Responsible for commissioning and troubleshooting the RS232,…

  • Low Profile Miner As-Builting

    Low Profile Miner As-Builting

    Agrium

    2008

    Agrium acquired a low-profile Joy American coal miner and modified it for use in a Canadian potash mine. After all modifications were completed, as-built drawings were created for future operation and maintenance (O&M) needs. This included a single-line diagram, as…

  • PM&P Coal Flexiveyor Construction

    PM&P Coal Flexiveyor Construction

    PM&P

    2007

    Responsible for the construction, scheduling, purchasing, and quality assurance of the electrical system for a prototype, intrinsically safe, 240′ mobile low-profile conveyor belt destined for Australia. The machine includes 16 control panels, 1000V power distribution, a 12-motor VFD-controlled drivetrain, belt…

  • PM&P FLEXIVEYOR SHUTDOWN MAINTENANCE

    PM&P FLEXIVEYOR SHUTDOWN MAINTENANCE

    Potash Corp. Saskatchewan

    2007

    During a maintenance shutdown, field modifications were required on a Prairie Machine & Parts (PM&P) Flexiveyor that had recently entered service. Each of the 15 carts that make up the mobile 300′ conveyor belt was equipped with a WEG VFD…

  • PM&P Potash Flexiveyor Construction

    PM&P Potash Flexiveyor Construction

    Mosaic Potash

    2007

    Construction all electrical systems for a 300-foot, 15-car mobile conveyor belt, including: 32 electric motors, 16 Allen Bradley VFDs, 400A distribution, Hydraulic steering and belt alignment, 500 I/O PLC. All work completed offsite in the Saskatoon PM&P shop. The electrical…