Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

  • 25kV service: critical path for Aspen Power Plant construction

    25kV service: critical path for Aspen Power Plant construction

    SaskPower

    2023

    Build ~25 km of three-phase line and install a transformer to service the construction site of SaskPower’s new 370 MW natural gas power plant.

  • Business Case & Scope Definition for 113km of Line

    Business Case & Scope Definition for 113km of Line

    SaskPower

    2023

    Distribution Planning has a capital budget for system improvements, aimed at ensuring SaskPower’s capacity to provide reliable power. I analyzed data and defined the scope for 113 km of line rebuilds, valued at approximately $10M.

  • Strategic improvement of highway powerline crossings results in safety & efficiency

    Strategic improvement of highway powerline crossings results in safety & efficiency

    SaskPower

    2023

    “What should we do with all the power lines that cross highways and interfere with oversized tall loads?” At first, this seems like a straightforward problem with a simple solution: “Bury everything underneath the highway!” However, a more strategic examination…

  • 118km of URD Replacement in 46 Areas

    118km of URD Replacement in 46 Areas

    SaskPower / SaskTel

    2021

    Urban Residential Distribution in collaboration with the construction of SaskTel’s Infinet fiber network was at the program peak in 2020-21. It was the second largest Distribution Asset Management & Planning program at $18.3M. The scope was to design and install…

  • ABB 25kV Cap bank & Master Controller

    ABB 25kV Cap bank & Master Controller

    SaskPower / ABB

    2014

    As part of SaskPower’s ongoing effort to stabilize the Northern grid, which previously included the installation of three ABB Static Voltage Compensators (SVC), this project added a four-bay capacitor bank, a master controller, and expanded the control building to accommodate…

  • 190km Fiber Optic Install – North Battleford to Meadow Lake

    190km Fiber Optic Install – North Battleford to Meadow Lake

    SaskPower

    2011

    In a collaboration between SaskTel and SaskPower, plans were laid to install approximately 190 km of fiber optic cable from North Battleford to Meadow Lake

  • Change Management Prevents $3.8M Sunk Costs

    Change Management Prevents $3.8M Sunk Costs

    SaskPower

    2022

    In September 2022, when I assumed the role of Acting Program Manager, $6.6 million worth of cross-arm replacement projects had been designed, tendered, and were awaiting increased spending approval. Actual costs exceeding estimates prompted an investigation into the business case…

  • Richard Road Rebuild – Multiphase 33km Pelican 3phase Backbone

    Richard Road Rebuild – Multiphase 33km Pelican 3phase Backbone

    SaskPower

    2020

    Approximately 1 km of the line was submerged in a slough, and with spring ice breakup expected in six months, the reliability risks were increasing. The project scope was divided into three phases, prioritizing risk mitigation, as completing the entire…

  • N. Battleford 20km of URD Replacement

    N. Battleford 20km of URD Replacement

    SaskPower / SaskTel

    2018

    Lead the design for the replacement of 20 km of Urban Residential Distribution (URD) at a cost of $2.97 million. Drilling (boring) once, under one contract to install SaskTel’s fiber network and replace SaskPower’s URD was the flagship Crown collaboration.…

  • N. Battleford to Battleford 25kV Tie Line

    N. Battleford to Battleford 25kV Tie Line

    SaskPower

    2020

    This project was initiated due to load growth in the town of Battleford. If operations required the entire town’s power generation to be supplied from North Battleford across the river, the capacity of the existing line was insufficient. The project…

  • Substation Addition to Existing Switching Station

    Substation Addition to Existing Switching Station

    SaskPower

    2014

    Lloydminster Switching station was originally a 230kV/138kV switching station with no distribution. This project would add a 138kV/25kV transformer, and distribution bays. The SCADA design at Lloydminster is a one-of as a result of being the prototype deployment of the…

  • ABB Static Voltage Compensator Unit 501 & 502

    ABB Static Voltage Compensator Unit 501 & 502

    SaskPower / ABB

    2012

    This project was part of an ongoing effort to stabilize the Northern grid. One ABB Static Voltage Compensators (SVC) was already installed in a previous project. The current scope included installing two more SVCs