VIEW PROJECT EXPERIENCE BY “SERVICE” TYPE

VIEW PROJECT EXPERIENCE BY TAG

Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

  • Golden Lake Substation – Phase 1 & 2

    Golden Lake Substation – Phase 1 & 2

    SaskPower

    2014-15

    To meet an aggressive schedule, Phase 1 of the Golden Lake switching station involved building a greenfield substation with a single 230kV-25kV transformer and three secondary feeders. TeleControl was the only SaskPower group involved during the construction phase, our scope…

  • 130km Fiber Optic Install – Critical Path to Golden Lake Success

    130km Fiber Optic Install – Critical Path to Golden Lake Success

    SaskPower

    2014

    Phase 1 of Golden Lake Substation was being constructed on an aggressive schedule, and TeleControl was positioned to materialize a massive opportunity to put the project ahead of schedule! If we could plough 130km of fiber optics, and make changes…

  • ABB 25kV Cap bank & Master Controller

    ABB 25kV Cap bank & Master Controller

    SaskPower / ABB

    2014

    As part of SaskPower’s ongoing effort to stabilize the Northern grid, which previously included the installation of three ABB Static Voltage Compensators (SVC), this project added a four-bay capacitor bank, a master controller, and expanded the control building to accommodate…

  • Power Line Carrier Replacement at 3 Remote Northern Sites

    Power Line Carrier Replacement at 3 Remote Northern Sites

    SaskPower / Cameco

    2015

    This project exemplified how an engaged field team can drive a major project from the ground up, rather than waiting for top-down planning. After ploughing fiber from North Battleford to Meadow Lake, the TeleControl team salvaged two sets of new…

  • Special Protection Scheme for Customer Backup Generators

    Special Protection Scheme for Customer Backup Generators

    SaskPower / Husky

    2012

    The Lloydminster Husky Upgrader has backup generators that require periodic testing as part of a preventative maintenance plan. Backup generator operation can potentially backfeed the grid, so a special protection scheme is needed. Our five-person TeleControl team worked at both…

  • Helicopter Only Access Repeater Station OPGW Connection

    Helicopter Only Access Repeater Station OPGW Connection

    SaskPower / Cameco

    2015

    The scope of work included trenching ~500 meters of fiber in conduit through the Canadian Shield, connecting the OPGW dead-end structure to the communications building. Installing and commissioning a Power Line Carrier (PLC) to fiber JMUX repeater, which was used…

  • 230kV Customer Interconnection at Potash Mine

    230kV Customer Interconnection at Potash Mine

    SaskPower / PCS

    2016

    Utility/customer projects are always unique due to the teamwork and communication required between two organizations. This project demanded even more coordination, as it involved leading the commissioning at the mine site while simultaneously orchestrating the commissioning at three other SaskPower…

  • 138kV Customer Interconnection at Potash Mine

    138kV Customer Interconnection at Potash Mine

    SaskPower / Mosaic

    2012

    Like all large industrial customers with a transmission connection to their customer-owned substation, utility protection, metering, and control are located onsite, interfacing with their equipment at a demarcation point. The project scope included installing a fiber optic connection to the…

  • 100km Fiber Optic Preventative Maintenance – Pilot Project

    100km Fiber Optic Preventative Maintenance – Pilot Project

    SaskPower

    2017

    For the first time since the TeleControl team at SaskPower began installing fiber optics, I initiated a preventative maintenance project to inspect and repair one of our fiber lines, which was approximately 20 years old.

  • Queen Elizabeth D-Plant Expansion

    Queen Elizabeth D-Plant Expansion

    SaskPower

    2015

    The Queen Elizabeth (QE) “D-Plant” project was an expansion of Saskatoon’s largest power plant. In terms of Communication Protection & Control (CP&C), it involved integrating a fourth location with the three existing critical locations within QE.