The Lloydminster Husky Upgrader has backup generators that require periodic testing as part of a preventative maintenance plan. Backup generator operation can potentially backfeed the grid, so a special protection scheme is needed. Our five-person TeleControl team worked at both the SaskPower switching station and the Husky site, 2 km apart. The project required us to minimize the cutover outage due to the impact on the Meridian Co-generator, demanding precise coordination and confident execution.
Special compliments to the TeleControl crew on their technical skills and customer service. Their services were appriciated
Bruce Osman – Husky Engineer