Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

  • Substation Addition to Existing Switching Station

    Substation Addition to Existing Switching Station

    SaskPower

    2014

    Lloydminster Switching station was originally a 230kV/138kV switching station with no distribution. This project would add a 138kV/25kV transformer, and distribution bays. The SCADA design at Lloydminster is a one-of as a result of being the prototype deployment of the…

  • ABB Static Voltage Compensator Unit 501 & 502

    ABB Static Voltage Compensator Unit 501 & 502

    SaskPower / ABB

    2012

    This project was part of an ongoing effort to stabilize the Northern grid. One ABB Static Voltage Compensators (SVC) was already installed in a previous project. The current scope included installing two more SVCs

  • Root Cause Fix for Beckwith AVR Failures Caused by GPR

    Root Cause Fix for Beckwith AVR Failures Caused by GPR

    SaskPower

    2012

    Approximately once a year, four regulators north of Meadow Lake experienced failures in the Beckwith automatic voltage regulator (AVR). Due to the extremely sandy soil, O&M staff suspected that these failures were caused by Ground Potential Rise (GPR) affecting the…

  • Delta Star Mobile Transformer SCADA

    Delta Star Mobile Transformer SCADA

    SaskPower

    2017

    SaskPower purchased a mobile 138kV substation, which included a D20MX RTU communicating with the control center via serial data encapsulated in IP using a Cisco IR809 cell modem. This was the first deployment of this setup. I worked alongside specialists…

  • LEDR Microwave Radio Replacement for Customer Co-Gen

    LEDR Microwave Radio Replacement for Customer Co-Gen

    SaskPower / NRgreen

    2016

    4RF Aprisa XE radios were purchased to replace two obsolete LEDR radio links used to protect Independent Power Producer (IPP) sites at Kerrobert and Loreburn. The protection scheme involved both direct tripping and comm-loss tripping functions.

  • Replacement of Obsolete M-series RTU and failed SER with Next Gen SCADA

    Replacement of Obsolete M-series RTU and failed SER with Next Gen SCADA

    SaskPower

    2017

    The project scope included installing the entire fiber optic network, IRIG-B timing, and replacing the GE M-Series RTU, which had approximately 150 controls, indications, alarms, SERs, and 18 analog measurements. This was replaced with a GE D400 HMI equipped with…

  • Prototype Development of SaskPower Distribution SCADA

    Prototype Development of SaskPower Distribution SCADA

    SaskPower

    2018

    Traditionally SaskPower’s substations were not connected to a centralized grid control center, but that was rapidly changing with SmartGrid. The goal of the project was to develop a scalable configuration template for hundreds of substations.

  • First Deployment of SaskPower Next Gen SCADA

    First Deployment of SaskPower Next Gen SCADA

    SaskPower

    2013

    The GE D400 was replacing the obsolete GE D20 remote terminal unit (RTU), which had served as the reliable SCADA head unit at SaskPower for decades. This pilot project aimed to test a prototype using a D20RIO (Remote I/O) that…

  • Golden Lake Substation – Phase 1 & 2

    Golden Lake Substation – Phase 1 & 2

    SaskPower

    2014-15

    To meet an aggressive schedule, Phase 1 of the Golden Lake switching station involved building a greenfield substation with a single 230kV-25kV transformer and three secondary feeders. TeleControl was the only SaskPower group involved during the construction phase, our scope…

  • ABB 25kV Cap bank & Master Controller

    ABB 25kV Cap bank & Master Controller

    SaskPower / ABB

    2014

    As part of SaskPower’s ongoing effort to stabilize the Northern grid, which previously included the installation of three ABB Static Voltage Compensators (SVC), this project added a four-bay capacitor bank, a master controller, and expanded the control building to accommodate…