Aberdeen & Martensville Station Fiber Optic Connection
•
As part of the Saskatoon Area Reinforcement (SAR) project, two new transmission stations—Aberdeen and Martensville—required connections to the existing fiber optic network. In total, approximately 40 km of new fiber optic cable was installed. As a member of the SaskPower…
-
Wind Farm 75MVA Collector Transformer Assembly
•
As part of a 6 person crew contracted to assemble a 75MVA, 34.5kV/138kV we assembled, vacuum filled, and commissioned under an aggressive 24 hour/day schedule.
-
PM&P Coal Flexiveyor Construction
•
Responsible for the construction, scheduling, purchasing, and quality assurance of the electrical system for a prototype, intrinsically safe, 240′ mobile low-profile conveyor belt destined for Australia. The machine includes 16 control panels, 1000V power distribution, a 12-motor VFD-controlled drivetrain, belt…
-
PM&P Potash Flexiveyor Construction
•
Construction all electrical systems for a 300-foot, 15-car mobile conveyor belt, including: 32 electric motors, 16 Allen Bradley VFDs, 400A distribution, Hydraulic steering and belt alignment, 500 I/O PLC. All work completed offsite in the Saskatoon PM&P shop. The electrical…