-
LEDR Microwave Radio Replacement for Customer Co-Gen
•
4RF Aprisa XE radios were purchased to replace two obsolete LEDR radio links used to protect Independent Power Producer (IPP) sites at Kerrobert and Loreburn. The protection scheme involved both direct tripping and comm-loss tripping functions.
-
130km Fiber Optic Install – Critical Path to Golden Lake Success
•
Phase 1 of Golden Lake Substation was being constructed on an aggressive schedule, and TeleControl was positioned to materialize a massive opportunity to put the project ahead of schedule! If we could plough 130km of fiber optics, and make changes…
-
Special Protection Scheme for Customer Backup Generators
•
The Lloydminster Husky Upgrader has backup generators that require periodic testing as part of a preventative maintenance plan. Backup generator operation can potentially backfeed the grid, so a special protection scheme is needed. Our five-person TeleControl team worked at both…
-
SAGD Oil Plant Bi-Annual Maintenance and Troubleshooting
•
As part of a contract crew, performed bi-annual electrical maintenance testing on two 25 kV oil-filled transformers, as well as 5 kV and 600 V switchgear. Additionally, in partnership with Schneider Electric, led the troubleshooting of a 5 kV reduced…
-
Electrical Maintenance Testing and Support
•
The gas cavern storage facility, which serves National Energy Board (NEB) regulated pipelines, maintains its operations with a tri-annual shutdown schedule. As part of a contract crew, we were responsible for the electrical maintenance and testing of the 138kV substation…