First Deployment of SaskPower Next Gen SCADA
•
The GE D400 was replacing the obsolete GE D20 remote terminal unit (RTU), which had served as the reliable SCADA head unit at SaskPower for decades. This pilot project aimed to test a prototype using a D20RIO (Remote I/O) that…
-
Power Line Carrier Replacement at 3 Remote Northern Sites
•
This project exemplified how an engaged field team can drive a major project from the ground up, rather than waiting for top-down planning. After ploughing fiber from North Battleford to Meadow Lake, the TeleControl team salvaged two sets of new…
-
Helicopter Only Access Repeater Station OPGW Connection
•
The scope of work included trenching ~500 meters of fiber in conduit through the Canadian Shield, connecting the OPGW dead-end structure to the communications building. Installing and commissioning a Power Line Carrier (PLC) to fiber JMUX repeater, which was used…
-
Northern Mine Special Protection Scheme over Power Line Carrier
•
A special protection scheme was required for a mine in Northern Saskatchewan, serviced by one of the longest unloaded transmission lines in the world. The solution involved adding a component to modify the existing power line carrier to transmit a…