Substation Addition to Existing Switching Station
•
Lloydminster Switching station was originally a 230kV/138kV switching station with no distribution. This project would add a 138kV/25kV transformer, and distribution bays. The SCADA design at Lloydminster is a one-of as a result of being the prototype deployment of the…
-
Root Cause Fix for Beckwith AVR Failures Caused by GPR
•
Approximately once a year, four regulators north of Meadow Lake experienced failures in the Beckwith automatic voltage regulator (AVR). Due to the extremely sandy soil, O&M staff suspected that these failures were caused by Ground Potential Rise (GPR) affecting the…
-
Delta Star Mobile Transformer SCADA
•
SaskPower purchased a mobile 138kV substation, which included a D20MX RTU communicating with the control center via serial data encapsulated in IP using a Cisco IR809 cell modem. This was the first deployment of this setup. I worked alongside specialists…
-
Prototype Development of SaskPower Distribution SCADA
•
Traditionally SaskPower’s substations were not connected to a centralized grid control center, but that was rapidly changing with SmartGrid. The goal of the project was to develop a scalable configuration template for hundreds of substations.
-
First Deployment of SaskPower Next Gen SCADA
•
The GE D400 was replacing the obsolete GE D20 remote terminal unit (RTU), which had served as the reliable SCADA head unit at SaskPower for decades. This pilot project aimed to test a prototype using a D20RIO (Remote I/O) that…