25kV service: critical path for Aspen Power Plant construction
•
Build ~25 km of three-phase line and install a transformer to service the construction site of SaskPower’s new 370 MW natural gas power plant.
-
Transformer Top Rescue SOP Development
•
Could we rescue a person injured while working on top of a transformer? As members of the OH&S committee we were tasked with 1) Identifying viable rescue solutions 2) Proving their effectiveness for SaskPower 3) Presenting our findings at Safety…
-
Golden Lake Substation – Phase 1 & 2
•
To meet an aggressive schedule, Phase 1 of the Golden Lake switching station involved building a greenfield substation with a single 230kV-25kV transformer and three secondary feeders. TeleControl was the only SaskPower group involved during the construction phase, our scope…
-
Power Line Carrier Replacement at 3 Remote Northern Sites
•
This project exemplified how an engaged field team can drive a major project from the ground up, rather than waiting for top-down planning. After ploughing fiber from North Battleford to Meadow Lake, the TeleControl team salvaged two sets of new…
-
230kV Customer Interconnection at Potash Mine
•
Utility/customer projects are always unique due to the teamwork and communication required between two organizations. This project demanded even more coordination, as it involved leading the commissioning at the mine site while simultaneously orchestrating the commissioning at three other SaskPower…
-
138kV Customer Interconnection at Potash Mine
•
Like all large industrial customers with a transmission connection to their customer-owned substation, utility protection, metering, and control are located onsite, interfacing with their equipment at a demarcation point. The project scope included installing a fiber optic connection to the…
-
FERTILIZER SUBSTATION AND PLANT EXPANSION
•
Increasing the electrical system by 10 MVA was required to support the demand for the planned plant expansion. The electrical scope included adding one 138 kV transformer to the customer-owned substation, four 5 kV motors, and approximately twenty 600 V…
-
230kV Customer Owned Substation Maintenance and Support
•
As part of a 6 person crew contracted to assemble a 75MVA, 34.5kV/138kV we assembled, vacuum filled, and commissioned under an aggressive 24 hour/day schedule.
-
Wind Farm 75MVA Collector Transformer Assembly
•
As part of a 6 person crew contracted to assemble a 75MVA, 34.5kV/138kV we assembled, vacuum filled, and commissioned under an aggressive 24 hour/day schedule.
-
30MW Boiler required substation expansion
•
Steam was required for the mine mill after smelting operations were discontinued. As a solution, a new 30 MW Cleaver-Brooks boiler was installed, including a new substation transformer, high voltage apparatus, switchgear, and DCS integration. Responsible for leading the commissioning…