ABB Static Voltage Compensator Unit 501 & 502
•
This project was part of an ongoing effort to stabilize the Northern grid. One ABB Static Voltage Compensators (SVC) was already installed in a previous project. The current scope included installing two more SVCs
-
Transformer Top Rescue SOP Development
•
Could we rescue a person injured while working on top of a transformer? As members of the OH&S committee we were tasked with 1) Identifying viable rescue solutions 2) Proving their effectiveness for SaskPower 3) Presenting our findings at Safety…
-
Golden Lake Substation – Phase 1 & 2
•
To meet an aggressive schedule, Phase 1 of the Golden Lake switching station involved building a greenfield substation with a single 230kV-25kV transformer and three secondary feeders. TeleControl was the only SaskPower group involved during the construction phase, our scope…
-
ABB 25kV Cap bank & Master Controller
•
As part of SaskPower’s ongoing effort to stabilize the Northern grid, which previously included the installation of three ABB Static Voltage Compensators (SVC), this project added a four-bay capacitor bank, a master controller, and expanded the control building to accommodate…
-
230kV Customer Interconnection at Potash Mine
•
Utility/customer projects are always unique due to the teamwork and communication required between two organizations. This project demanded even more coordination, as it involved leading the commissioning at the mine site while simultaneously orchestrating the commissioning at three other SaskPower…
-
138kV Customer Interconnection at Potash Mine
•
Like all large industrial customers with a transmission connection to their customer-owned substation, utility protection, metering, and control are located onsite, interfacing with their equipment at a demarcation point. The project scope included installing a fiber optic connection to the…