230kV Customer Owned Substation Maintenance and Support
•
As part of a 6 person crew contracted to assemble a 75MVA, 34.5kV/138kV we assembled, vacuum filled, and commissioned under an aggressive 24 hour/day schedule.
-
SAGD Oil Plant Bi-Annual Maintenance and Troubleshooting
•
As part of a contract crew, performed bi-annual electrical maintenance testing on two 25 kV oil-filled transformers, as well as 5 kV and 600 V switchgear. Additionally, in partnership with Schneider Electric, led the troubleshooting of a 5 kV reduced…
-
Power Factor Correction Controller Retrofit
•
The plant had a two-stage capacitor bank for power factor correction (PFC) regulated by an obsolete controller that failed. The replacement controller required modifications to integrate with the existing ladder logic. Additionally, because the replacement was not an exact match,…