Business Case Cellular Change Management Chemical Commissioning Construction CP&C DCS Design Emergency Repair Environment Fiber Optics Grounding and Bonding IR Imaging Load Flow Logistics Maintenance Testing Microwave Mining Oil & Gas Overhead Power Generation Power Line Carrier Power Quality Protection Coordination Prototype QAQC Right of Way Safety SCADA Scalability Scope Definition SubStation Training Transmission Troubleshooting Underground VFD Wind Energy

Wind Farm 75MVA Collector Transformer Assembly

CLIENT:

Ghost Pine Wind Farm

LOCATION:

Three Hills, AB

ROLE:

Field Technologist

PROJECT YEAR:

2010

As part of a six-person crew contracted to assemble a 75 MVA, 34.5 kV/138 kV transformer, we assembled, vacuum-filled, and commissioned it under an aggressive 24-hour/day schedule. In addition to the challenges of night work, we faced the difficulty of completing the assembly during winter. The massive transformer had a capacity of 56,354 liters of oil. All work was completed without incident, thanks to excellent teamwork that mitigated the significant risks posed by working at heights on a slippery transformer and rigging and hoisting components in the dark.